Upgrading bathroom plumbing during a tiling project is the best way to ensure a modern, efficient, and leak-free system. At Local Tilers London, we integrate plumbing upgrades with tiling work to avoid future disruptions and ensure seamless results. Whether it’s replacing old pipes, adjusting water pressure, or installing new fixtures, upgrading the plumbing while tiling ensures everything is properly aligned and built to last. Here’s how we carry out a bathroom plumbing upgrade during a tiling project.
Step 1: Assess the Existing Plumbing System #
Before starting any tiling work, we thoroughly inspect the current plumbing system to check for leaks, outdated pipes, or water pressure issues. Many older bathrooms have corroded pipes or inefficient layouts that can cause long-term problems. By assessing the system early, we determine whether pipes need replacing, rerouting, or upgrading to meet modern standards.
Step 2: Plan the New Plumbing Layout #
A bathroom renovation is an opportunity to improve the layout of pipes and fixtures. If you are moving a sink, shower, or toilet, the plumbing needs to be adjusted accordingly. We create a plan that ensures water supply and drainage lines are correctly positioned before tiling begins. This avoids unnecessary cutting or drilling into newly tiled surfaces later.
Step 3: Replace Old Pipes and Install New Fixtures #
If the pipes are outdated, we replace them with modern, corrosion-resistant materials such as copper or PEX piping. These options provide better durability and water flow. Drainage systems are also upgraded if needed, ensuring that waste pipes are properly sloped to prevent blockages. At this stage, new fixtures such as showerheads, faucets, or concealed cisterns are installed so they fit perfectly once the tiling is complete.
Step 4: Ensure Waterproofing and Leak Prevention #
Before tiling begins, all plumbing connections must be properly sealed to prevent future leaks. We test the water supply and drainage system to ensure there are no leaks or weak points. Waterproof membranes are applied in wet areas, such as around showers and bathtubs, to provide extra protection. This step is crucial to prevent water damage beneath the tiles.
Step 5: Prepare for Tiling Installation #
Once the plumbing upgrades are complete, the surfaces are prepared for tiling. Pipes and fittings are securely fixed, and openings for faucets and drainage points are properly measured to ensure precise tile cuts. By integrating the plumbing work into the tiling process, we ensure a seamless fit and professional finish.
Step 6: Final Plumbing Checks After Tiling #
Once the tiles have been installed and grouted, we carry out final plumbing checks. Fixtures are securely connected, and silicone sealant is applied around sinks, bathtubs, and shower enclosures to ensure watertight seals. The water supply is tested again to confirm there are no leaks or pressure issues.
Upgrading bathroom plumbing during a tiling project ensures a long-lasting and efficient system while avoiding unnecessary future repairs. At Local Tilers London, we provide expert plumbing and tiling services to create a modern, functional, and waterproof bathroom. If you’re planning a renovation and need professional plumbing upgrades, contact us today for a consultation and a free quote.